All Seasons Hire Supply Temporary Hot Water Solution to exclusive Homes in Central London

When the existing plant room that serviced these exclusive houses and apartments in central Kensington was scheduled for a complete overhaul   All Seasons Hire were called to arrange a temporary hot water solution.

New Boiler Build Final

 

Following an extensive site survey it was decided that due to the distances and also lack of space between the various buildings a combination of 6 separate sets of units would be required.

Each one of the 6 sets would require a 100 kW Boiler feeding an intelligent plate heat exchanger which in turn would feed a 1000 Ltr hot water storage vessel.

Lists were drawn up for the various components required and the All Seasosns Hire team of experienced engineers then set to work on building several bespoke Boilers and Storage Vessels.

 

Boiler & Tank duo

A schedule for separate installations was drawn up to make sure a seamless install could be made in each case. Room for installation was always going to be tight with the only areas available being the light wells at the front of the buildings so it was with great care that the hiabs delivering the equipment lowered the equipment into place.

Install Treble picAll work was completed successfully, resulting in the seamless changeover required and matching the clients expectations.  The refurbishment is scheduled to take 12 weeks however should it start to run over and into the colder autumn weather a plan is already in place to run the buildings heating as well.