EMERGENCY CHILLER TURNKEY SOLUTION TO 999 SUPPORT CENTRE

Regional Police Control Centre

Challenge

When a Regional Police Control Centre suffered a catastrophic cooling failure, the County council rang All Seasons Hire for help. The site had lost cooling to both the call centre & its data suite, this meant that a critical emergency operation was on the verge of closing.

All Seasons completed a technical site survey same day, however due to the sensitivity of the site and obvious security issues several options regarding equipment positioning were ruled out.

A solution which consisted of a packaged air cooled water Chiller & Generator set was agreed on with flexible hoses running into the building and connecting to their existing pipework system, however to get the equipment onto site All Seasons had build a temporary roadway to facilitate delivery & positioning.

Solution

tick

On Site survey within 2 hours to understand & create a project plan to deliver & install a 300kW Chiller & generator within 48 hours

tick

Project manager handled all communication between contractor & local authority to ensure alignment & key timings were met

tick

Scaffolding & other enabling works carried out as part of install

tick

Remedial works identified & completed after emergency installation

case study-turnkey solutions

Benefits

tick

Full turnkey solution with project management offered due to complexity of project & number of stakeholders involved

tick

Full remote monitoring system, constantly checking power & temperature outputs as well as generator fuel levels

tick

Cooling, Contracting & Power solutions all provided by All Seasons Hire –all equipment provided by one supplier

tick

All Seasons team highly experienced in emergency sectors

Emergency chiller-1

More Posts

Get more information and stay informed

Contact us directly on 0800 082 8001 or email us on info@allseasonshire.com. Alternatively fill out the box to the right and we will send you more Information.